• 未标题-1-10

20kW Permanent Magnet Generator Grid-Connected Hydropower Project Case

Fergana Valley Irrigation Canal Grid-Tied Full Sales Project, Uzbekistan

Project Summary

A long-idle water energy resource at an irrigation canal in the Fergana Valley, Uzbekistan. Greef Energy deployed a 20kW low-speed permanent magnet generator + GREEF grid-connected controller + 20kW inverter pure grid-tied hydropower system. After six months of operation, average daily generation is approximately 380 kWh, with full feed-in to the grid. Expected annual revenue is about 82,000 CNY, with a simple payback period of only 0.67 years. The system requires no batteries and no on-site staff, truly achieving "using water to support farming, selling electricity to increase income".

  1. 1.      Project Background and Opportunity
Project type 20kW hydropower grid-tied
Location Eastern Uzbekistan, Fergana Valley
Hydrological conditions Main irrigation canal, effective head 11.5 meters, perennial flow rate 0.3 – 0.5 m³/s
Core pain point Continuous water flow, wasted energy; rising farm electricity costs year by year
Policy incentives Small hydropower feed-in tariff 0.32 USD/kWh (approx. 2.3 CNY/kWh), guaranteed revenue
Customer request Utilize canal resources, full sales to obtain long-term stable income

 

  1. 2.      System Configuration
Core Equipment Model/Specification Key Advantages
Water turbine Customer self-made  
Generator 20kW low-speed permanent magnet synchronous generator 500 rpm ultra-low speed, direct drive (no gearbox), maintenance-free
Controller GREEF smart grid-connected controller Auto-synchronization, MPPT tracking, anti-islanding protection, remote monitoring
Inverter 20kW three-phase grid-tied inverter Compliant with IEC 62116, THD < 4%

System Structure Diagram

1

3. Core Operational Data (first 6 months)

Key Metric Actual Data
Cumulative generation 69,500 kWh
Average daily generation approx. 380 kWh
Average monthly revenue approx. 6,800 CNY
Estimated annual revenue approx. 82,000 CNY
Total system investment 55,000 CNY (equipment, civil works, grid connection)
Simple payback period approx. 0.67 years
2

4. Customer Testimonial

"This canal flows day and night – I never thought it could make money. After Greef installed the system, it runs by itself. Every day I check my phone to see how much electricity was generated and how much I earned. I'll recover my investment in less than a year, and after that it's pure profit."

— Bakhtiyar Yusupov, Project Investor

3
4

5. Related Recommendations

Further reading: 30kW Panama mountain area hybrid grid-tied/off-grid hydropower case (self-consumption + surplus feed-in)
Get a proposal: Free download "Small Hydropower Grid-Tied Investment Return Calculator"


Post time: Apr-24-2026